Project Assignment 11 – Implementation Review

Implementation Review

All team members are required to attend the interview. You will not receive your final grade until your website is complete and I have access to your application code.

Your team will meet with me in my office for approximately 45 minutes.  The purpose of the interview is to review:

  • website
  • demonstrate your UI
  • explain usability test result
  • discuss the final meeting with your client (scientist)
  • how much of the application is completed
  • suggested changes to application
  • discuss the course

Do not be anxious about the review.

Website and Directory

Make sure your web site is complete. Your web site should have posted and linked with public access:

  • Team and App name
  • Proposal
  • Graduate students
  • Scientists
  • Initial design documents:
  • Brief overview of the system
  • Descriptions of important stakeholders, including users
  • Descriptions of the environment that users will be in while using the device and performing tasks
  • Scanned or transcribed notes from the interviews with the scientist
  • A scenario describing the nominal use of the application
  • Simplified hierarchical task interaction design A description of your database schema
  • Presonas
  • Scenarios
  • Cognitive Walkthrough documents:
  • Presentation slides
  • Paper prototypes
  • Use scenarios
  • Usability and Design concerns
  • Support documents
  • Notes
  • Design Change Documents
  • Final Design review documents:
  • Presentation Slides
  • Screen shots and drawing of the app
  • Presentation scrip
  • Supporting documents
  • Notes
  • More Design Change Documents
  • Updated front end designs and documents
  • Needs
  • Task Analysis
  • Personas
  • Citizen Science white paper
  • Citizen Science presentation slides
  • Database Schema Design Specifications:
  • All versions
  • Make clear the version used in the application
  • Summary Design Change Documents after:
  • Cognitive Walkthrough
  • Review with Graduate Student about the Heuristic Evaluation
  • Review with Scientists about the Cognitive Walkthrough
  • Review with me about the Cognitive Walkthrough
  • Final Design Presentation
  • Review with Scientists about the Final Design Presentation
  • All notes from meeting with/from:
  • Me during the design review
  • Scientists
  • Cognitive Walkthrough
  • Graduate Students about Heuristic Evaluation
  • Final Design Presentation
  • Final Review with Scientist
  • Links to Graduate students:
  • stakeholder analysis
  • personas
  • task analysis
  • Heuristic Evaluation
  • Usability Test Schedule
  • Usability Test Plan
  • Usability Test Analysis
  • In sure that the master branch on GitHub is what is currently deplored. If your project is deployed to a production sever then the master branch on GitHub should be contain what is deployed on on that production server. If your project is a type that is not deployed to a sever, the master branch on GitHub, should be the final working version.
  • Any Implementation documents: See Project Assignment 5 – Implementation Requirements.
  • A file explaining how to install and special requirements for running your app. If your project is deployed to a server that provide you then this document is not neccessary.
  • A file summarizing each Team member’s contribution to the project. Individual team members can write their own contribution.

Review Format

We will view your user interface and your website for completeness. I will discuss your usability test results. Your team should be prepared to answer questions about:

  • design decisions
  • implementation issues, including the simulator
  • proposed design changes
  • application completeness
  • general feedback back about the course

The team is responsible for bring any required hardware to run the apps.

Email Me

When you website and project directory is up-to-date email me(pastel at mtu.edu) and Karla Ktialong (kitalong at mtu.edu) stating so. The email should have the subject line

cs4760-hu4628 Project Assignment 11 – <team name>

You will not receive your final grade until your website is complete and I have access to your application code.